Skip to content

Latest commit

 

History

History
112 lines (94 loc) · 9.58 KB

File metadata and controls

112 lines (94 loc) · 9.58 KB

Agile V Skills: Routing Guide

Repository version: 3.9.x Catalog: 49 skills currently present. [Preview] means the skill's current YAML frontmatter contains metadata.status: draft; presence on main does not make that contract stable.

Load agile-v-core first, then only the stage and risk-relevant skills. See Installation Profiles and the Golden Journey.

Complete Catalog

Intent Skill Location Status
Foundation, directives, context and lifecycle rules agile-v-core agile-v-core/ Current
Multi-agent waves and handoffs agile-v-pipeline agile-v-pipeline/ Current
Cycle 2+, change requests, archival agile-v-lifecycle agile-v-lifecycle/ Current
Risk, CAPA, approvals, security, revalidation agile-v-compliance agile-v-compliance/ Current
Runtime control matrix agile-v-control-matrix agile-v-control-matrix/ Current
Risk-based DQ/IQ/OQ/PQ qualification, intended-use validation, stage release, requalification agile-v-gxp-qualification agile-v-gxp-qualification/ [Draft]
Bainbridge-aware Human Oversight Case for L2+ Human Gates agile-v-human-oversight agile-v-human-oversight/ [Draft]
Bind controlled SOPs to Agile-V controls/gates (SOP conformance) agile-v-sop-adapter agile-v-sop-adapter/ [Draft]
Interface, test, data-type, and time-allocation checks agile-v-quality-gates agile-v-quality-gates/ Current
Coding anti-pattern prevention agile-v-behavioral agile-v-behavioral/ Current
AI run provenance and AI/ML-BOM agile-v-aibom agile-v-aibom/ [Preview]
Architecture Decision Records (immutable, supersession) agile-v-adr agile-v-adr/ [Draft]
User research to candidate requirements discovery-analyst discovery-analyst/ Current
Security/privacy threat analysis threat-modeler threat-modeler/ Current
UX, accessibility, interaction constraints ux-spec-author ux-spec-author/ Current
Formal requirements and baselines requirement-architect requirement-architect/ Current
Independent ambiguity/constraint findings logic-gatekeeper logic-gatekeeper/ Current
Language-agnostic implementation build-agent build-agent/ Current
Python implementation build-agent-python domains/build-agent-python/ Current
JavaScript/TypeScript/Web implementation build-agent-js domains/build-agent-js/ Current
NestJS implementation build-agent-nestjs domains/build-agent-nestjs/ Current
Dart/Flutter implementation build-agent-dart domains/build-agent-dart/ Current
Embedded C/C++ and firmware build-agent-embedded domains/build-agent-embedded/ Current
Hardware schematics, netlists, HDL schematic-generator schematic-generator/ Current
Independent test design from baseline test-designer test-designer/ Current
Independent execution and verification red-team-verifier red-team-verifier/ Current
Representative intended-use validation validation-agent validation-agent/ Current
Hazard analysis and safety assurance safety-engineer safety-engineer/ Current
Decision logs, traceability, audit evidence compliance-auditor compliance-auditor/ Current
Standards-based repository documentation documentation-agent documentation-agent/ Current
Backlog, sprint, and Product Owner work agile-v-product-owner agile-v-product-owner/ Current
Rollout, rollback, and deployment plan release-manager release-manager/ Current
Metrics, dashboards, alerts, SLOs observability-planner observability-planner/ Current
Existing-system Gate 0 overview system-understanding-agent skills/system-understanding-agent/ Current
Pre-change impact map impact-analysis-agent skills/impact-analysis-agent/ Current
Impact-based regression selection regression-selection-agent skills/regression-selection-agent/ Current
Requirement/component/test graph links graph-traceability-agent skills/graph-traceability-agent/ Current
Predicted-versus-actual diff evidence diff-evidence-agent skills/diff-evidence-agent/ Current
Business vision, model, portfolio venture-strategist venture-strategist/ [Preview]
R&D pipeline, radar, prototypes, IP rd-innovator rd-innovator/ [Preview]
Go-to-market, launch, growth gtm-executor gtm-executor/ [Preview]
Finance, OKRs, resources, vendors business-operations business-operations/ [Preview]
Shared C-Suite governance primitives c-suite-foundation c-suite-foundation/ [Preview]
CEO orchestration and strategic alignment chief-exec chief-exec/ [Preview]
CTO architecture governance chief-tech chief-tech/ [Preview]
CFO financial governance chief-finance chief-finance/ [Preview]
CHRO people governance chief-people chief-people/ [Preview]
COO operational governance chief-ops chief-ops/ [Preview]
Periodic executive briefing aggregation c-suite-update c-suite-update/ [Preview]

Key Routing Distinctions

User asks for Route Boundary
“Check the requirements” logic-gatekeeper Records independent findings; never rewrites the draft or baseline
“Build this” build-agent + one domain build skill Requires Gate 1-approved, frozen baseline
“Design the tests” test-designer Reads the baseline, not implementation
“Verify it works as specified” red-team-verifier Produces .agile-v/VERIFICATION_SUMMARY.md and VER-XXXX evidence
“Is this human approval real oversight, or just a signature?” agile-v-human-oversight Requires a blind precommit, claim-specific independence, and recovery evidence — a second agent is not independent assurance
“Validate it with users/in operations” validation-agent Produces intended-use validation plan/protocol/report after verification
“Run Eval Gate / prepare Gate 2” red-team-verifier + compliance-auditor EVAL_RESULTS.md status must be PASS or authorized WAIVED; link it from VERIFICATION_SUMMARY.md
“Assess hazards or unacceptable harm” safety-engineer Tailors safety methods and assurance; does not replace verification or validation
“Can the agent/tool execute?” agile-v-control-matrix + agile-v-compliance Check data, tool, model, rights, approval, rollback, and evidence controls
“Understand this existing repo/change impact” system-understanding-agent then impact/regression skills Complete Gate 0 before requirements and build
“Plan a release” release-manager Starts after Gate 2 approval; no autonomous production release
“Set strategy/govern the business” relevant preview business/C-Suite skill Preview contracts require local approval and baselining

Canonical Workflows

New or Changed Feature

agile-v-core -> risk classification -> requirement-architect (persist draft) -> logic-gatekeeper (independent findings) -> architect revision -> Human Gate 1 -> frozen baseline -> build-agent + test-designer (independent) -> red-team-verifier -> Eval Gate -> validation-agent when intended-use validation is required -> AI manifest/evidence bundle -> Human Gate 2 -> release-manager -> observability-planner

Follow the evidence and stop conditions in the Golden Journey.

Existing Repository

  1. system-understanding-agent creates the Gate 0 system overview.
  2. impact-analysis-agent predicts affected components, interfaces, risks, and tests.
  3. regression-selection-agent selects existing regression coverage and flags gaps.
  4. Continue the canonical feature flow through a persisted draft and Gate 1 baseline.
  5. After implementation, graph-traceability-agent links requirements, components, changes, and tests.
  6. diff-evidence-agent compares predicted and actual impact before independent verification and Gate 2.

Regulated or Safety-Relevant Work

Use the regulated install profile. Classify L0-L4; add threat-modeler, safety-engineer, and validation-agent according to scope; maintain control, trace, approval, verification, applicable validation, release, and AI influence evidence. Load agile-v-human-oversight at Human Gates for L2+ work so approval is oversight-effectiveness evidence, not only authority evidence. Skills and templates support an assurance process but do not establish certification or regulatory conformity.

Business Preview

Load c-suite-foundation before a relevant chief-* skill. C-Suite skills govern and delegate; functional skills execute strategy, R&D, GTM, and operations. Use c-suite-update only to aggregate already controlled domain evidence. Do not treat preview outputs as approved decisions without accountable human review.

Loading Rules

  1. Load agile-v-core first.
  2. Use the smallest applicable installation profile.
  3. Preserve independence with separate fresh contexts; if one context is unavoidable, design tests before implementation.
  4. Pass durable file references, not chat-only handoffs.
  5. Requirement changes after Gate 1 require a change request, independent review, approval, and a new baseline.
  6. Keep verification and intended-use validation evidence separate.
  7. A skill's frontmatter status controls preview labeling; branch location does not override it.