You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
This matrix assesses Agile V Skills v1.3 against ISO 9001:2015 clauses relevant to design and development. Clauses related to general organizational context (4.1-4.3), leadership policy (5.2-5.3), and support infrastructure (7.2-7.4) are excluded as they require organizational implementation beyond what a skill set can provide.
Compliance Matrix
4.4 -- QMS and Its Processes
Aspect
Status
Evidence
Gap
Process definition
COMPLIANT
5-stage orchestration pipeline with handoff rules (agile-v-core)
--
Process interactions
COMPLIANT
Pipeline diagram shows agent interactions; Compliance Auditor observes all stages
--
Process performance indicators
NOT COVERED
--
No KPIs defined at QMS level. The compliance-auditor defines 7 project-level metrics but these are per-project, not QMS-wide. User must: Define organizational QMS KPIs.
Risk to processes
NOT COVERED
--
Risk Register covers project risks, not process risks. User must: Assess risks to the Agile V workflow itself.
5.1 -- Leadership and Commitment
Aspect
Status
Evidence
Gap
Management review points
COMPLIANT
Human Gate 1 (Blueprint), Human Gate 2 (Validation), Evidence Summary format
--
Quality policy
NOT COVERED
--
No mechanism to import organizational quality policy. User must: Define quality policy; reference it in .agile-v/config.json.
Customer focus
NOT COVERED
--
No customer satisfaction input loop. User must: Feed customer feedback into requirements via Requirement Architect.
6.1 -- Actions to Address Risks and Opportunities
Aspect
Status
Evidence
Gap
Technical risk identification
COMPLIANT
Logic Gatekeeper constraint checks; Risk Register in .agile-v/RISK_REGISTER.md with severity matrix
--
Process risk assessment
PARTIAL
Halt conditions prevent execution risk
No systematic process-level risk assessment. User must: Conduct organizational risk assessment for the AI-augmented development process.
Opportunity identification
NOT COVERED
--
System is defensive only. User must: Include opportunity identification in management reviews.
7.5 -- Documented Information
Aspect
Status
Evidence
Gap
Creation and updating
COMPLIANT
.agile-v/ directory with 12+ controlled files; revision headers; write-through persistence
--
Approval status
COMPLIANT
APPROVALS.md records Gate approvals with identity, authority, timestamp
--
Version control
COMPLIANT
Cycle-tagged documents; ART-XXXX.N revision scheme; per-REQ status tags
--
Retention and archival
COMPLIANT
Cycle archival to .agile-v/cycles/CN/ (frozen, read-only); append-only logs
--
Access control
PARTIAL
Agent access is protocol-based (honor system)
No technical enforcement of document access control. User must: Implement file system permissions or repository access controls.
7 defined KPIs in compliance-auditor; VER records; coverage tracking
--
Trend analysis
COMPLIANT
Cycle-over-cycle trend comparison built into KPI reporting
--
Analysis procedures
PARTIAL
Metrics computed per project
No organizational analysis or customer satisfaction measurement. User must: Aggregate metrics across projects; implement customer feedback.
9.2 -- Internal Audit
Aspect
Status
Evidence
Gap
Continuous audit function
COMPLIANT
Compliance Auditor observes all stages; ATM; HITL alerts
--
Audit program
NOT COVERED
--
No scheduled audit intervals, scope rotations, or criteria. User must: Define an audit program with frequency, scope, and auditor assignment.
Corrective action tracking
COMPLIANT
CAPA protocol with effectiveness verification
--
10.1 -- Nonconformity and Corrective Action
Aspect
Status
Evidence
Gap
Correction
COMPLIANT
Post-verification feedback loop; 3-attempt limit with escalation
--
Root cause analysis
COMPLIANT
CAPA protocol with 5-Whys methodology
--
Preventive action
COMPLIANT
CAPA preventive action field with effectiveness verification
--
Corrective action records
COMPLIANT
CAPA_LOG.md (append-only)
--
10.2 -- Continual Improvement
Aspect
Status
Evidence
Gap
Iteration framework
COMPLIANT
Multi-cycle V-loop with cycle history
--
Metrics trending
COMPLIANT
KPIs with cycle-over-cycle trend analysis
--
Lessons learned
PARTIAL
Decision Log captures rationale
No formal lessons-learned mechanism. User must: Conduct retrospectives at cycle boundaries; record in Decision Log.
Summary
Status
Count
COMPLIANT
10
PARTIAL
4
NOT COVERED (user responsibility)
5
The "NOT COVERED" items require organizational action and cannot be addressed by the skill set alone. See COMP-007: Gap Roadmap for a prioritized action plan.