Skip to content

Latest commit

 

History

History
145 lines (107 loc) · 8.81 KB

File metadata and controls

145 lines (107 loc) · 8.81 KB

ISO 9001:2015 Compliance Matrix

Document ID: COMP-002 Version: 1.3 Date: 2026-02-21 Classification: Public Status: Approved

← Back to Documentation Hub | ← Previous: Compliance Posture | Next: ISO 13485 Matrix →


Scope

This matrix assesses Agile V Skills v1.3 against ISO 9001:2015 clauses relevant to design and development. Clauses related to general organizational context (4.1-4.3), leadership policy (5.2-5.3), and support infrastructure (7.2-7.4) are excluded as they require organizational implementation beyond what a skill set can provide.

Compliance Matrix

4.4 -- QMS and Its Processes

Aspect Status Evidence Gap
Process definition COMPLIANT 5-stage orchestration pipeline with handoff rules (agile-v-core) --
Process interactions COMPLIANT Pipeline diagram shows agent interactions; Compliance Auditor observes all stages --
Process performance indicators NOT COVERED -- No KPIs defined at QMS level. The compliance-auditor defines 7 project-level metrics but these are per-project, not QMS-wide. User must: Define organizational QMS KPIs.
Risk to processes NOT COVERED -- Risk Register covers project risks, not process risks. User must: Assess risks to the Agile V workflow itself.

5.1 -- Leadership and Commitment

Aspect Status Evidence Gap
Management review points COMPLIANT Human Gate 1 (Blueprint), Human Gate 2 (Validation), Evidence Summary format --
Quality policy NOT COVERED -- No mechanism to import organizational quality policy. User must: Define quality policy; reference it in .agile-v/config.json.
Customer focus NOT COVERED -- No customer satisfaction input loop. User must: Feed customer feedback into requirements via Requirement Architect.

6.1 -- Actions to Address Risks and Opportunities

Aspect Status Evidence Gap
Technical risk identification COMPLIANT Logic Gatekeeper constraint checks; Risk Register in .agile-v/RISK_REGISTER.md with severity matrix --
Process risk assessment PARTIAL Halt conditions prevent execution risk No systematic process-level risk assessment. User must: Conduct organizational risk assessment for the AI-augmented development process.
Opportunity identification NOT COVERED -- System is defensive only. User must: Include opportunity identification in management reviews.

7.5 -- Documented Information

Aspect Status Evidence Gap
Creation and updating COMPLIANT .agile-v/ directory with 12+ controlled files; revision headers; write-through persistence --
Approval status COMPLIANT APPROVALS.md records Gate approvals with identity, authority, timestamp --
Version control COMPLIANT Cycle-tagged documents; ART-XXXX.N revision scheme; per-REQ status tags --
Retention and archival COMPLIANT Cycle archival to .agile-v/cycles/CN/ (frozen, read-only); append-only logs --
Access control PARTIAL Agent access is protocol-based (honor system) No technical enforcement of document access control. User must: Implement file system permissions or repository access controls.

8.1 -- Operational Planning and Control

Aspect Status Evidence Gap
Planning COMPLIANT Orchestration pipeline; wave-based parallel execution; pre-execution validation (5 dimensions) --
Control COMPLIANT Checkpoint types (auto, human-verify, human-decision, human-action); halt conditions --

8.2 -- Requirements for Products and Services

Aspect Status Evidence Gap
Requirements determination COMPLIANT Requirement Architect decomposes intent into REQ-XXXX with constraints, verification criteria, done criteria --
Requirements review COMPLIANT Logic Gatekeeper validates; Human Gate 1 approves --
Requirements changes COMPLIANT CR-XXXX protocol with impact analysis, Human approval, re-validation --

8.3 -- Design and Development

Aspect Status Evidence Gap
Planning (8.3.1) COMPLIANT Pipeline stages; phase directories; pre-execution validation --
Inputs (8.3.2) COMPLIANT REQUIREMENTS.md with constraints and verification criteria --
Controls (8.3.3) COMPLIANT Logic Gatekeeper review; Human Gate 1; Red Team Protocol; Human Gate 2 --
Outputs (8.3.4) COMPLIANT Build Manifest with traceability; per-artifact REQ headers --
Changes (8.3.5) COMPLIANT CR-XXXX protocol; impact analysis; re-validation; artifact versioning --
Design review records PARTIAL Decision Log captures decisions but Logic Gatekeeper results are applied in-place. User must: Ensure Logic Gatekeeper findings are captured before changes are applied (Decision Log entry per finding).

8.5 -- Production and Service Provision

Aspect Status Evidence Gap
Identification and traceability (8.5.2) COMPLIANT REQ → ART → TC → VER full chain; ATM with gap detection; dangling artifact alerts --
Controlled conditions (8.5.1) COMPLIANT Pipeline enforces: only approved inputs enter synthesis; outputs manifested; verification independent --

8.7 -- Control of Nonconforming Outputs

Aspect Status Evidence Gap
Detection COMPLIANT Red Team Verifier: PASS/FAIL/FLAG; stub detection; anti-pattern scan --
Severity classification COMPLIANT CRITICAL (blocks release), MAJOR (fix required), MINOR (deferrable) --
Disposition COMPLIANT Rework, Accept-as-is (concession), Reject, Defer -- with approver records --
NC register PARTIAL NCs logged in Verification Summary and Decision Log No consolidated NC register for trending. User must: Aggregate NC data across projects for organizational analysis.

9.1 -- Monitoring, Measurement, Analysis, Evaluation

Aspect Status Evidence Gap
Measurement COMPLIANT 7 defined KPIs in compliance-auditor; VER records; coverage tracking --
Trend analysis COMPLIANT Cycle-over-cycle trend comparison built into KPI reporting --
Analysis procedures PARTIAL Metrics computed per project No organizational analysis or customer satisfaction measurement. User must: Aggregate metrics across projects; implement customer feedback.

9.2 -- Internal Audit

Aspect Status Evidence Gap
Continuous audit function COMPLIANT Compliance Auditor observes all stages; ATM; HITL alerts --
Audit program NOT COVERED -- No scheduled audit intervals, scope rotations, or criteria. User must: Define an audit program with frequency, scope, and auditor assignment.
Corrective action tracking COMPLIANT CAPA protocol with effectiveness verification --

10.1 -- Nonconformity and Corrective Action

Aspect Status Evidence Gap
Correction COMPLIANT Post-verification feedback loop; 3-attempt limit with escalation --
Root cause analysis COMPLIANT CAPA protocol with 5-Whys methodology --
Preventive action COMPLIANT CAPA preventive action field with effectiveness verification --
Corrective action records COMPLIANT CAPA_LOG.md (append-only) --

10.2 -- Continual Improvement

Aspect Status Evidence Gap
Iteration framework COMPLIANT Multi-cycle V-loop with cycle history --
Metrics trending COMPLIANT KPIs with cycle-over-cycle trend analysis --
Lessons learned PARTIAL Decision Log captures rationale No formal lessons-learned mechanism. User must: Conduct retrospectives at cycle boundaries; record in Decision Log.

Summary

Status Count
COMPLIANT 10
PARTIAL 4
NOT COVERED (user responsibility) 5

The "NOT COVERED" items require organizational action and cannot be addressed by the skill set alone. See COMP-007: Gap Roadmap for a prioritized action plan.


Version Date Author Changes
1.3 2026-02-21 agile-v.org Initial release

← Back to Documentation Hub | ← Previous: Compliance Posture | Next: ISO 13485 Matrix →