Requirements

Note: This document captures user requirements and needs. Technical design decisions and implementation details should be documented in an Architecture Decision Record (ADR) in docs/adr/.

Linked Issues: #3684, #4024

Problem Statement

As a developer using Brighter's ServiceActivator with RabbitMQ, I would like the service to shut down cleanly when I press Ctrl+C, so that the process exits without requiring a force-kill.

There are two related bugs:

Bug 1: Shutdown hang — sync-over-async deadlock (#3684)

After Ctrl+C the message pump logs "Finished running message loop" but the process never terminates. The root cause is a sync-over-async deadlock inside BrighterAsyncContext's single-threaded scheduler:

  1. The Proactor's EventLoop runs inside BrighterAsyncContext.Run() on a single-threaded BrighterTaskScheduler.
  2. When MT_QUIT is received, the Proactor calls Channel.Dispose().
  3. ChannelAsync.Dispose(bool) calls _messageConsumer.DisposeAsync() fire-and-forget — the ValueTask is not awaited (ChannelAsync.cs:205).
  4. RmqMessageConsumer.DisposeAsync() eventually calls Dispose(true) on RmqMessageGateway.
  5. RmqMessageGateway.Dispose(bool) does blocking sync-over-async: Channel?.AbortAsync().Wait() and RemoveConnectionAsync().GetAwaiter().GetResult() (RmqMessageGateway.cs:206-212).
  6. RemoveConnectionAsync internally awaits without ConfigureAwait(false), so continuations are posted back to the BrighterSynchronizationContext.
  7. But the only thread serving that context is blocked in .GetAwaiter().GetResult() — classic deadlock.
  8. BrighterAsyncContext.Run() never returns because _outstandingOperations > 0, so Proactor.Run() never returns, the Performer task never completes, Dispatcher._controlTask hangs in Task.WaitAny(), and the process is stuck.

Confirmed still present in v10.3.0 (reported 2026-03-11).

Bug 2: Connection pool race condition (#4024)

The static RmqMessageGatewayConnectionPool has a race where a stale ConnectionShutdown event handler can dispose a newer connection sharing the same pool key ({user}.{password}.{host}.{port}.{vhost}), causing OperationInterruptedException ("Connection close forced").

The ShutdownHandler closure captures the connectionId string but does not verify the connection instance. If:

  1. Connection A shuts down and is replaced by Connection B in the pool (same key)
  2. Connection A's shutdown event was already queued before the handler was unsubscribed
  3. The stale handler fires and calls TryRemoveConnection(connectionId), which disposes Connection B

Additionally, RemoveConnection (sync variant) checks ContainsKey outside the lock (TOCTOU issue).

Proposed Solution

For #3684 (shutdown deadlock)

  • Eliminate the sync-over-async chain in the Proactor's dispose path. The Proactor should await channel disposal asynchronously rather than calling synchronous Dispose() which triggers blocking .Wait() / .GetAwaiter().GetResult() calls inside the BrighterAsyncContext.
  • Ensure ChannelAsync properly awaits DisposeAsync() instead of fire-and-forget.
  • Add ConfigureAwait(false) to connection pool async methods so continuations don't capture BrighterSynchronizationContext.

For #4024 (pool race condition)

  • Guard the ShutdownHandler with a ReferenceEquals check: only remove/dispose the connection if the instance being shut down is the same one currently in the pool.
  • Move the ContainsKey check inside the lock in the sync variant's RemoveConnection.

Requirements

Functional Requirements

  1. Clean shutdown: When ServiceActivatorHostedService.StopAsync() completes, the RMQ connection must be closed and the process must exit without requiring a force-kill.
  2. No sync-over-async in async pipeline: The Proactor dispose path must not call blocking .Wait(), .GetAwaiter().GetResult(), or BrighterAsyncContext.Run() on async RMQ operations. The async channel and consumer must be disposed via await DisposeAsync().
  3. ChannelAsync must properly dispose: ChannelAsync must not fire-and-forget DisposeAsync(). It must either await it (in an async dispose path) or properly synchronize it.
  4. ConfigureAwait(false) on library internals: RmqMessageGatewayConnectionPool async methods must use ConfigureAwait(false) to avoid capturing ambient SynchronizationContext.
  5. Connection pool instance safety: The ConnectionShutdown event handler must verify via ReferenceEquals that the connection being shut down is the same instance currently in the pool before removing/disposing it.
  6. Thread-safe pool removal: The sync variant's RemoveConnection must move the ContainsKey check inside the lock (fix TOCTOU).
  7. Both Sync and Async variants: Fixes must be applied to both Paramore.Brighter.MessagingGateway.RMQ.Sync and Paramore.Brighter.MessagingGateway.RMQ.Async packages.

Non-functional Requirements

  • No behavioral regression: Existing RMQ tests must continue to pass. The connection pool must still share connections correctly in production.
  • Thread safety: All connection pool mutations must remain properly synchronized.
  • Idempotent disposal: Calling Dispose/DisposeAsync multiple times on a consumer must not throw.

Constraints and Assumptions

  • The connection pool is static and shared across the application lifetime — this design is intentional for production use (connection reuse).
  • The pool key is {user}.{password}.{host}.{port}.{vhost}, so all consumers/producers to the same broker share one entry.
  • The ConnectionShutdown event fires asynchronously from the RabbitMQ client library and may fire after a replacement connection has been added to the pool.
  • The Proactor runs its event loop inside BrighterAsyncContext.Run() on a single-threaded scheduler — any blocking call on that thread will deadlock if the blocked operation's continuations are posted back to the same context.
  • RmqMessageGateway.Dispose(bool) is called from multiple paths (consumer dispose, producer dispose) — changes must not break the sync variant's disposal.

Out of Scope

  • Changing the connection pool from static/shared to per-consumer connections.
  • Adding connection pool reference counting.
  • Changing the Dispatcher's control task architecture.
  • Fixing pre-existing flaky [Trait("Fragile", "CI")] tests beyond what these fixes naturally resolve.
  • Other transport implementations (Kafka, SQS, Redis, etc.).

Acceptance Criteria

  1. Process exits after Ctrl+C: A ServiceActivator with RMQ subscriptions (using MessagePumpType.Proactor) shuts down and the process exits within a reasonable timeout after Ctrl+C (reproducer from issue #3684).
  2. No deadlock in async dispose path: The Proactor dispose chain does not call blocking .Wait() or .GetAwaiter().GetResult() on code that captures BrighterSynchronizationContext.
  3. No stale handler disposal: When a connection is replaced in the pool, the old connection's shutdown handler does not dispose the new connection.
  4. Existing RMQ tests pass: All non-fragile RMQ tests pass.
  5. Idempotent consumer dispose: Disposing an already-disposed consumer does not throw.

Additional Context

Shutdown chain — current (broken) behavior

Ctrl+C → ServiceActivatorHostedService.StopAsync()
       → Dispatcher.End()
       → Consumer.Shut() → Channel.Stop() [enqueues MT_QUIT]
       → Proactor EventLoop receives MT_QUIT
       → Channel.Dispose()                                    [inside BrighterAsyncContext]
       → ChannelAsync.Dispose() fire-and-forgets DisposeAsync()
       → RmqMessageConsumer.DisposeAsync() → RmqMessageGateway.Dispose(true)
       → AbortAsync().Wait() / RemoveConnectionAsync().GetResult()  [BLOCKS single thread]
       → Continuations posted to BrighterSynchronizationContext     [DEADLOCK — thread blocked]
       → BrighterAsyncContext.Run() never returns
       → Performer task never completes → Dispatcher._controlTask hangs
       ✗ Process stuck forever

Expected chain after fix

Ctrl+C → ServiceActivatorHostedService.StopAsync()
       → Dispatcher.End()
       → Consumer.Shut() → Channel.Stop() [enqueues MT_QUIT]
       → Proactor EventLoop receives MT_QUIT
       → await Channel.DisposeAsync()                         [properly async]
       → await RmqMessageConsumer.DisposeAsync()              [no sync-over-async]
       → await AbortAsync(); await RemoveConnectionAsync()    [with ConfigureAwait(false)]
       → Connection closed → background threads terminate
       → BrighterAsyncContext.Run() returns
       → Performer task completes → Dispatcher control task completes
       → Process exits cleanly

Key source files

  • src/Paramore.Brighter/ChannelAsync.cs — fire-and-forget DisposeAsync (line 205)
  • src/Paramore.Brighter.MessagingGateway.RMQ.Async/RmqMessageGateway.cs — blocking sync-over-async in Dispose(bool) (lines 206-212)
  • src/Paramore.Brighter.MessagingGateway.RMQ.Async/RmqMessageGatewayConnectionPool.cs — missing ConfigureAwait(false), ShutdownHandler race
  • src/Paramore.Brighter.MessagingGateway.RMQ.Sync/RmqMessageGatewayConnectionPool.cs — ShutdownHandler race, TOCTOU in RemoveConnection
  • src/Paramore.Brighter.MessagingGateway.RMQ.Sync/RmqMessageConsumer.cs
  • src/Paramore.Brighter.MessagingGateway.RMQ.Async/RmqMessageConsumer.cs
  • src/Paramore.Brighter.ServiceActivator/Proactor.cs — EventLoop calls Channel.Dispose() (line 218)