Currently when running FRAM with a TAMM, FRAM saves the FRAM run number and the fram version in the 1 tab, but not the base period information. It would be convenient to have the base period accessible in the TAMM rather than needing to track down the associated .mdb and look up the base period associated with the run.
Currently when running FRAM with a TAMM, FRAM saves the FRAM run number and the fram version in the
1tab, but not the base period information. It would be convenient to have the base period accessible in the TAMM rather than needing to track down the associated .mdb and look up the base period associated with the run.