Triggered via schedule March 5, 2026 00:30
Status Failure
Total duration 6h 12m 48s
Artifacts

update-and-rebase.yml

on: schedule
prepare
5s
prepare
Matrix: update-rebase-branch
Matrix: build-6-12 / build
Matrix: build-6-18 / build
Matrix: build-6-6 / build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build-6-6 / ARM64 - config_64k
The strategy configuration was canceled because "build-6-6.build.ubuntu-24_04-arm_config_4" failed
build-6-6 / ARM64 - config_64k
The operation was canceled.
build-6-6 / x86_64 - defconfig
The strategy configuration was canceled because "build-6-6.build.ubuntu-24_04-arm_config_4" failed
build-6-6 / x86_64 - defconfig
The operation was canceled.
build-6-18 / ARM64 - config_4k
The job has exceeded the maximum execution time of 6h0m0s
build-6-18 / ARM64 - config_64k
The job has exceeded the maximum execution time of 6h0m0s