Skip to content

Commit c97b557

Browse files
authored
Merge pull request #30 from PxTools/AsaArrhen-patch-5-1
Asa arrhen patch 5 1
2 parents 963ab68 + 4ed1594 commit c97b557

File tree

2 files changed

+10
-10
lines changed

2 files changed

+10
-10
lines changed

docs/PxWeb2/project/Solution.md

Lines changed: 6 additions & 6 deletions
Original file line numberDiff line numberDiff line change
@@ -1,4 +1,4 @@
1-
# PxWeb solution
1+
# PxWeb 2 solution
22
In the project, we have made some choices about how we will work in the project across two countries, in order to create opportunities for other countries to contribute in the long term with both development and user testing of PxWeb 2.0. In addition, we have made some choices to find the best solution for installing PxWeb. All this to reach the main goal to create a user-friendly PxWeb.
33
## WCAG and Search Engine Optimization (SEO)
44
- The new interface will follow the rules for A and AA in [WCAG 2.1](https://www.w3.org/TR/WCAG21/)
@@ -14,13 +14,13 @@ It will be possible to change
1414
- font
1515
- corner radius of the elements in the interface.
1616
## Open source at GitHub
17-
The new interface will be able do install directly from GitHub. Also documentation will be found here.
17+
The new interface is able to install directly from GitHub. Also documentation is found here.
1818
[PxTools at GitHub](https://www.pxtools.net/documentation/overview/)
1919
## Usertest
20-
We are following the UX design process in this project.
20+
We have been following following the UX design process in this project.
2121
![The Ux design process](https://github.com/PxTools/PxWeb2/assets/81364833/8534bfdb-1d0c-49ef-8f2b-5b59357a37bf)
22-
All the choices we make must be based on user insigth.
22+
All the choices we made are based on user insigth.
2323
The main focus has been navigation, understand the main fuctionaility in PxWeb and how the most used task should work.
24-
We have done four usertest so far, both on desktop and mobile, and will continue in the whole project period.
24+
We have several usertests during the project, both on desktop and mobile.
2525
## Possibility for connection
26-
When PxWeb 2.0 interface is ready for production, it is easy to connect other tools such as Highcharts, Tableau, Power BI and other AI products. This can be connected both by using saved queries from PxWeb 2.0 or by connecting directly to PxWebApi 2.0.
26+
In the PxWeb 2.0 interface, it is easy to connect other tools such as Highcharts, Tableau, Power BI and other AI products. This can be connected both by using saved queries from PxWeb 2.0 or by connecting directly to PxWebApi 2.0.

docs/PxWeb2/project/overview.md

Lines changed: 4 additions & 4 deletions
Original file line numberDiff line numberDiff line change
@@ -10,7 +10,7 @@ The project had two goals
1010
The steering group consist of managers at Communication and IT in SCB and SSB.
1111
### Project team
1212
The team had participants from both Statistics Sweden and Statistics Norway.
13-
The team is set up with
13+
The team was set up with
1414
- Project leader
1515
- Scrum master
1616
- Architects
@@ -20,6 +20,6 @@ The team is set up with
2020
- Technical lead
2121
- Test leader
2222
- Testers
23-
## Contact for questions and comments
24-
Kristin Glomsås, Statistics Norway [[email protected]](mailto:[email protected])
25-
Åsa Arrhén, Statistics Sweden [[email protected]](mailto:[email protected])
23+
## Contact for questions and comments
24+
- Kristin Glomsås, Statistics Norway [[email protected]](mailto:[email protected])
25+
- Åsa Arrhén, Statistics Sweden [[email protected]](mailto:[email protected])

0 commit comments

Comments
 (0)