Skip to content

Latest commit

 

History

History
214 lines (127 loc) · 2.4 KB

turnkey-schedule-details-04ce3d7.md

File metadata and controls

214 lines (127 loc) · 2.4 KB

Turnkey Schedule Details

The following tables list the overall turnkey schedule details for the intelligent scenario:

Scheduling Options Tab

Name

Description

Planned Start

Displays when the turnkey schedule starts.

Scheduled in Time Zone

Displays the timezone selected while creating schedule.

Recurrence Pattern

Displays summary of the schedule pattern.

Planned End

Displays the end condition of the schedule as defined by the user, which can be:

  • No end condition

  • A fixed date and time

  • Number of occurrences

On Non-Working Day

Displays schedule restrictions selected for a non-working day. As defined, the schedule adapts if the next run starts on a non-working day as per the calendar. The possible values are:

  • No restriction

  • Run on the next working day

  • Run on the previous working day

  • Don't run

Calendar

Displays calendar selected for schedule.

Turnkey Runs Tab

Name

Description

Run ID

Displays the ID for the turnkey run.

Status

Displays the turnkey run status, which can be:

  • Running - Turnkey run is in progress.

  • Success - Turnkey run completed.

  • Failed - Turnkey run failed due to errors.

  • Canceled - Turnkey run canceled by user.

Run Type

Displays the turnkey run type, which can be:

  • Immediate - Turnkey run that runs immediately once created.

  • Recurrent - Turnkey runs based on the periodic schedule.

  • Restart - Turnkey run that is restarted after a failed run.

Created At

Displays start time of the run.

Ended at

Displays end time of the run.