Repository navigation
Commit 0a8b277
docs: enumerate the 14 curtain thread-forming screws in the Build Guide
The steps previously showed only 7 of the 14 explicitly. Clarify Step 3 as four
side screws PER carriage (eight total) plus the 1 + 2 carriage-top screws (which
become the rope clamp/tension screws), and add a running tally:
2 (long tubes) + 1 (pulley) + 8 (carriage sides) + 3 (carriage tops) = 14, + 8
body = 22. Matches the owner-confirmed count and the BOM.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>1 parent 95c3435 commit 0a8b277
1 file changed
Lines changed: 3 additions & 1 deletion
| Original file line number | Diff line number | Diff line change | |
|---|---|---|---|
| |||
173 | 173 | | |
174 | 174 | | |
175 | 175 | | |
176 | | - | |
| 176 | + | |
| 177 | + | |
| 178 | + | |
177 | 179 | | |
178 | 180 | | |
179 | 181 | | |
| |||
0 commit comments