|
6 | 6 |
|
7 | 7 | Assembling a Ropener takes about **20 minutes** with three common hand tools — no soldering. It comes together in three stages: the **motor body**, the **curtain-rail carriages**, and **attaching it to your curtains**. Follow whichever guide below suits you — they all cover the same build. |
8 | 8 |
|
9 | | -> 🆕 **New in v1.1** — This guide covers the current **v1.1** hardware: |
| 9 | +> 🆕 **Current hardware — v1.2.1.** Notable changes since v1.0: |
10 | 10 | > - **Stronger pull (11 lb → 15 lb)** from a smaller-diameter **MK8** drive gear (replaces the MK7). |
11 | 11 | > - **One larger 633ZZ bearing (3 × 13 × 5 mm) per arm** instead of two small bearings. |
12 | 12 | > - **Pre-cut PTFE tubes** (10 / 40 / 70 mm) — no measuring or razor-cutting. |
13 | 13 | > |
14 | | -> Print from [`hardware/plastics/v1.1`](https://github.com/Valar-Systems/Ropener/tree/main/hardware/plastics/v1.1). The v1.0 files remain in the repo for anyone who already built one. |
| 14 | +> Print from [`hardware/plastics/v1.2.1`](https://github.com/Valar-Systems/Ropener/tree/main/hardware/plastics/v1.2.1). Earlier revisions remain in the repo for anyone who already built one. |
15 | 15 |
|
16 | 16 | ## How to build |
17 | 17 |
|
@@ -87,7 +87,7 @@ Everything the build needs is below. For the full, maintained list see the [Bill |
87 | 87 | | NEMA 17 stepper motor | 1 | |
88 | 88 | | 24 V 1.5 A power adapter | 1 | |
89 | 89 | | Cable extension | as needed | |
90 | | -| Foam mounting squares (set of 5) | 5 | |
| 90 | +| Foam mounting square, 1" | 5 | |
91 | 91 | | 1.6 mm rope | 30 ft | |
92 | 92 | | PTFE tubing (pre-cut: 2 × 10 mm, 2 × 40 mm, 2 × 70 mm) | 6 | |
93 | 93 | | M3 square nut | 4 | |
@@ -154,6 +154,8 @@ This device works on the following curtain types. |
154 | 154 |
|
155 | 155 | > **Overview.** Along the rod, from one end to the other, you'll have: the **pulley**, a **carriage with one screw on top**, a **carriage with two screws on top**, and the **motor-side** anchor. |
156 | 156 |
|
| 157 | +> **How many carriages?** The standard build uses **two** (one single-screw, one double-screw). How carriage count should scale as the number of curtain panels grows is not documented yet — **TODO**. |
| 158 | +
|
157 | 159 | <!-- 📷 media/build-guide/15-setup-overview.png — rail layout: pulley, 1-screw carriage, 2-screw carriage, motor side --> |
158 | 160 |
|
159 | 161 | The **PTFE tubes come pre-cut** — no cutting needed. You'll have **two of each length**: |
|
0 commit comments