Preload fixes #9
test.yml
on: push
Lint Code
31s
Build
24s
Matrix: Run Tests
Annotations
3 errors and 3 warnings
|
Run Tests (1.24.x)
Process completed with exit code 1.
|
|
Run Tests (1.23.x)
The strategy configuration was canceled because "test._1_24_x" failed
|
|
Run Tests (1.23.x)
The operation was canceled.
|
|
Build
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|
|
Lint Code
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|
|
Run Tests (1.23.x)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|