Labels
Labels
42 labels
- A feature idea that is large enough to require a sprint (5 days) or more and has smaller sub-issues.
- Second highest priority, should be worked on as soon as the Priority-1 issues are finished
- Lowest priority. Don't work on issues with this label. Revisit these in future sprints as needed.