I can make a sandwich in one minute and then I need 30 seconds to serve the sandwich and take money from the customer.
tasks are
4:00 serve sandwich 3
4:30 make sandwich 4 <<< make as soon as previous one is served (30 secs from start of serving)
5:30 serve sandwich 4 <<< serve as soon as it is made (1 min)
16:00 take a well earned break! << break as soon as served (30 secs)
As per requirement for Jacket potatoes(JP)
Jacket potatoes are pre-baked but need to be heated in a microwave for 2 and half minutes. I then need 30 seconds to top them and 30 seconds to serve them.
0:00 Put jacket potato in microwave
0:01 Make sandwich 1
<truncated>
2:31 Serve sandwich 2
3:01 take jacket potato out of microwave << as soon as SW 2 is served
3:31 top jacket potato << as soon as JP is taken out of MW (30 secs ???)
4:01 serve jacket potato << as soon as topping is done i.e 30 secs
4:31 take a break! << as soon as serving is done i.e 30 secs
Looks like putting JP into MW takes only 1 sec but taking JP out takes 30 secs which is not mentioned in the requirement either? Is it deliberate ?
The text was updated successfully, but these errors were encountered:
Looks like you're correct, 3:01 should be remove and top jacket potato and then all subsequent timings should be shifted back by 30s. Have you submitted a correction PR?
In an actual interview you would be able to discuss ambiguities in the statement with the interviewer but I realise that sometimes these problems get used for other things.
As per req for Sandwich
tasks are
As per requirement for Jacket potatoes(JP)
Looks like putting JP into MW takes only 1 sec but taking JP out takes 30 secs which is not mentioned in the requirement either? Is it deliberate ?
The text was updated successfully, but these errors were encountered: