chore(deps): update dependency ava to v8 #1146
test.yml
on: pull_request
Matrix: test_matrix
test_dev
30s
test
3s
Annotations
9 errors
|
test_matrix (20)
Process completed with exit code 1.
|
|
test_matrix (20.6.1)
The strategy configuration was canceled because "test_matrix._20" failed
|
|
test_matrix (20.6.1)
The operation was canceled.
|
|
test_matrix (21)
The strategy configuration was canceled because "test_matrix._20" failed
|
|
test_matrix (21)
The operation was canceled.
|
|
test_dev
Process completed with exit code 1.
|
|
test_matrix (18.17)
The strategy configuration was canceled because "test_matrix._20" failed
|
|
test_matrix (18.17)
The operation was canceled.
|
|
test
Process completed with exit code 1.
|