Skip to content

chore(deps): update dependency ava to v8 #1146

chore(deps): update dependency ava to v8

chore(deps): update dependency ava to v8 #1146

Triggered via pull request July 21, 2026 04:33
Status Failure
Total duration 47s
Artifacts

test.yml

on: pull_request
Matrix: test_matrix
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test_matrix (20)
Process completed with exit code 1.
test_matrix (20.6.1)
The strategy configuration was canceled because "test_matrix._20" failed
test_matrix (20.6.1)
The operation was canceled.
test_matrix (21)
The strategy configuration was canceled because "test_matrix._20" failed
test_matrix (21)
The operation was canceled.
test_dev
Process completed with exit code 1.
test_matrix (18.17)
The strategy configuration was canceled because "test_matrix._20" failed
test_matrix (18.17)
The operation was canceled.
test
Process completed with exit code 1.