I loaded up a graph with a 142 bp path in it. I asked to see that path from 1 to 142. I was told that that ran off the end of the 142 bp path, and I had to use 1-141 instead.
We should accept 1-based inclusive ranges that end on the last base of the path.
I loaded up a graph with a 142 bp path in it. I asked to see that path from 1 to 142. I was told that that ran off the end of the 142 bp path, and I had to use 1-141 instead.
We should accept 1-based inclusive ranges that end on the last base of the path.