Skip to content

chore(deps): update aztecprotocol/aztec docker tag to v4#227

Merged
apham0001 merged 2 commits intomainfrom
renovate/major-aztec-node-chart-updates
Mar 6, 2026
Merged

chore(deps): update aztecprotocol/aztec docker tag to v4#227
apham0001 merged 2 commits intomainfrom
renovate/major-aztec-node-chart-updates

Conversation

@renovate
Copy link
Contributor

@renovate renovate bot commented Feb 27, 2026

This PR contains the following updates:

Package Update Change
aztecprotocol/aztec major 3.0.34.0.1

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR was generated by Mend Renovate. View the repository job log.

@renovate renovate bot requested a review from a team as a code owner February 27, 2026 02:09
@renovate
Copy link
Contributor Author

renovate bot commented Feb 27, 2026

Edited/Blocked Notification

Renovate will not automatically rebase this PR, because it does not recognize the last commit author and assumes somebody else may have edited the PR.

You can manually request rebase by checking the rebase/retry box above.

⚠️ Warning: custom changes will be lost.

@apham0001 apham0001 merged commit b094da9 into main Mar 6, 2026
2 checks passed
@apham0001 apham0001 deleted the renovate/major-aztec-node-chart-updates branch March 6, 2026 08:53
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant