Skip to content

Weekly Flink Connector Kafka CI #126

Weekly Flink Connector Kafka CI

Weekly Flink Connector Kafka CI #126

Triggered via schedule November 10, 2024 00:23
Status Cancelled
Total duration 50m 47s
Artifacts

weekly.yml

on: schedule
Matrix: compile_and_test
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 8 warnings
compile_and_test (1.19.1, v3.3) / compile_and_test (8)
The action 'Compile and test' has timed out after 50 minutes.
compile_and_test (1.20.0, v3.3) / compile_and_test (17)
FailFast: cancelling since parallel instance has failed
compile_and_test (1.20.0, v3.3) / compile_and_test (17)
The operation was canceled.
compile_and_test (1.19.1, v3.3) / compile_and_test (17)
Cache save failed.
compile_and_test (1.19.1, v3.3) / compile_and_test (21)
Cache save failed.
compile_and_test (1.19.1, v3.3) / compile_and_test (11)
Cache save failed.
compile_and_test (1.20.0, v3.3) / compile_and_test (21)
Cache save failed.
compile_and_test (1.20.0, v3.3) / compile_and_test (11)
Cache save failed.
compile_and_test (1.20.0, v3.3) / compile_and_test (8)
Cache save failed.
compile_and_test (1.19.1, v3.3) / compile_and_test (8)
Cache save failed.
compile_and_test (1.20.0, v3.3) / compile_and_test (17)
Cache save failed.