Repository navigation
Gating: nightly deep batteries + document the merge-blocking policy - #28
Merged
Merged
Conversation
heavy-assurance.yml now runs on a nightly schedule (07:00 UTC) in addition to manual dispatch, with inputs.* || default fallbacks so scheduled runs use the deep defaults (1800s/target fuzz, 256GB PractRand). These deep/long batteries stay off the per-PR gate to avoid the 6-hour job limit but run continuously. workflows/README documents the new posture: the full 23-check battery (5 platforms + 5 proof engines + constant-time/Miri/Valgrind/sanitizers on both arches + fuzz/RNG + audit/deny) is now required to merge; F* gates every PR via the prebuilt GHCR image (~2 min). Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Implements the gating posture for a library that should rarely change: thoroughness over speed, quality gating non-negotiable.
Branch protection (already applied)
The required status checks went from 3 to 23: every proof and platform test now blocks merges (5 platforms, 5 proof engines including F*, constant-time on both arches, Miri, Valgrind x2, sanitizers x4, fuzz, RNG, audit/deny), with strict + reviews preserved.
This PR
inputs.* || defaultfallbacks so scheduled runs use the deep defaults (1800s/target fuzz, 256 GB PractRand). The deep/long batteries stay off the per-PR gate (they would risk the 6-hour job limit) but run continuously.This PR is itself the first run under the 23-check gate; it must pass the whole battery to merge.
Generated with Claude Code