Skip to content

8390906: Allow to collect per-test code coverage information - #32489

Closed
shurymury wants to merge 2 commits into
openjdk:masterfrom
shurymury:JDK-8390906
Closed

8390906: Allow to collect per-test code coverage information#32489
shurymury wants to merge 2 commits into
openjdk:masterfrom
shurymury:JDK-8390906

Conversation

@shurymury

@shurymury shurymury commented Aug 21, 2026

Copy link
Copy Markdown
Member

The only changes needed are to pass the requires options to the grabber and report generator and run in othervm mode with concurrency 1.



Progress

  • Change must be properly reviewed (1 review required, with at least 1 Reviewer)
  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue

Issue

  • JDK-8390906: Allow to collect per-test code coverage information (Enhancement - P3)

Reviewers

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.org/jdk.git pull/32489/head:pull/32489
$ git checkout pull/32489

Update a local copy of the PR:
$ git checkout pull/32489
$ git pull https://git.openjdk.org/jdk.git pull/32489/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 32489

View PR using the GUI difftool:
$ git pr show -t 32489

Using diff file

Download this PR as a diff file:
https://git.openjdk.org/jdk/pull/32489.diff

Using Webrev

Link to Webrev Comment

@bridgekeeper

bridgekeeper Bot commented Aug 21, 2026

Copy link
Copy Markdown

👋 Welcome back shurailine! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk

openjdk Bot commented Aug 21, 2026

Copy link
Copy Markdown

@shurymury This change now passes all automated pre-integration checks.

ℹ️ This project also has non-automated pre-integration requirements. Please see the file CONTRIBUTING.md for details.

After integration, the commit message for the final commit will be:

8390906: Allow to collect per-test code coverage information

Reviewed-by: erikj

You can use pull request commands such as /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been 360 new commits pushed to the master branch:

As there are no conflicts, your changes will automatically be rebased on top of these commits when integrating. If you prefer to avoid this automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk Bot changed the title JDK-8390906: Allow to collect per-test code coverage information 8390906: Allow to collect per-test code coverage information Aug 21, 2026
@openjdk openjdk Bot added the build build-dev@openjdk.org label Aug 21, 2026
@openjdk

openjdk Bot commented Aug 21, 2026

Copy link
Copy Markdown

@shurymury The following label will be automatically applied to this pull request:

  • build

When this pull request is ready to be reviewed, an "RFR" email will be sent to the corresponding mailing list. If you would like to change these labels, use the /label pull request command.

@openjdk openjdk Bot added the rfr Pull request is ready for review label Aug 21, 2026
@mlbridge

mlbridge Bot commented Aug 21, 2026

Copy link
Copy Markdown

Webrevs

Comment thread make/RunTests.gmk Outdated
@openjdk openjdk Bot added the ready Pull request is ready to be integrated label Aug 26, 2026
@shurymury

Copy link
Copy Markdown
Member Author

/integrate

@openjdk

openjdk Bot commented Aug 26, 2026

Copy link
Copy Markdown

Going to push as commit 5b96789.
Since your change was applied there have been 365 commits pushed to the master branch:

Your commit was automatically rebased without conflicts.

@openjdk openjdk Bot added the integrated Pull request has been integrated label Aug 26, 2026
@openjdk openjdk Bot closed this Aug 26, 2026
@openjdk openjdk Bot removed ready Pull request is ready to be integrated rfr Pull request is ready for review labels Aug 26, 2026
@openjdk

openjdk Bot commented Aug 26, 2026

Copy link
Copy Markdown

@shurymury Pushed as commit 5b96789.

💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

build build-dev@openjdk.org integrated Pull request has been integrated

Development

Successfully merging this pull request may close these issues.

2 participants