Skip to content

nova05: populate ceph_conf from files by ceph.yml#3773

Draft
bogdando wants to merge 1 commit intoopenstack-k8s-operators:mainfrom
bogdando:nova05epsilon
Draft

nova05: populate ceph_conf from files by ceph.yml#3773
bogdando wants to merge 1 commit intoopenstack-k8s-operators:mainfrom
bogdando:nova05epsilon

Conversation

@bogdando
Copy link
Contributor

@bogdando bogdando commented Mar 17, 2026

The ceph.yml post_stage_run hook (via cifmw_ceph_client role) writes Ceph config files to cifmw_ceph_client_fetch_dir (default /tmp/). This template reads those files and provides them as base64-encoded values under data.ceph_conf (DCN convention).

Jira: OSPRH-27641
Generated-by: claude-4.6-opus-high

The ceph.yml post_stage_run hook (via cifmw_ceph_client role) writes
Ceph config files to cifmw_ceph_client_fetch_dir (default /tmp/).
This template reads those files and provides them as base64-encoded
values under data.ceph_conf (DCN convention).

Generated-by: claude-4.6-opus-high
Signed-off-by: Bohdan Dobrelia <bdobreli@redhat.com>
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Mar 17, 2026

Skipping CI for Draft Pull Request.
If you want CI signal for your change, please convert it to an actual PR.
You can still manually trigger a test run with /test all

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Mar 17, 2026

[APPROVALNOTIFIER] This PR is NOT APPROVED

This pull-request has been approved by:
Once this PR has been reviewed and has the lgtm label, please assign amartyasinha for approval. For more information see the Code Review Process.

The full list of commands accepted by this bot can be found here.

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant