Update installer/lib/mix/tasks/phx.new.ex #5257
Annotations
8 errors and 1 warning
mix test (OTP 27.2 | Elixir 1.17.3):
test/phoenix/integration/endpoint_test.exs#L126
test adapters starts on configured port and serves requests and stops for prod (Phoenix.Integration.EndpointTest)
|
mix test (OTP 27.2 | Elixir 1.17.3)
Process completed with exit code 2.
|
mix test (OTP 24.3.4.17 | Elixir 1.15.8)
The job was canceled because "_1_17_3_27_2_true_true" failed.
|
mix test (OTP 24.3.4.17 | Elixir 1.15.8):
test/phoenix/integration/endpoint_test.exs#L126
test adapters starts on configured port and serves requests and stops for prod (Phoenix.Integration.EndpointTest)
|
mix test (OTP 24.3.4.17 | Elixir 1.15.8)
Process completed with exit code 2.
|
integration-test-elixir (1.15.8, 24.3.4.17, alpine-3.20.3)
Process completed with exit code 2.
|
integration-test-elixir (1.17.3, 27.1.2, alpine-3.20.3)
The job was canceled because "_1_15_8_24_3_4_17_alpine-" failed.
|
integration-test-elixir (1.17.3, 27.1.2, alpine-3.20.3)
Process completed with exit code 2.
|
mix test (OTP 27.2 | Elixir 1.17.3)
The Ubuntu-20.04 brownout takes place from 2025-02-01. For more details, see https://github.com/actions/runner-images/issues/11101
|