Skip to content

improve scope integration for phx.gen.auth #5265

improve scope integration for phx.gen.auth

improve scope integration for phx.gen.auth #5265

Triggered via push February 21, 2025 17:39
Status Failure
Total duration 6m 2s
Artifacts

ci.yml

on: push
Matrix: integration-test-elixir
Matrix: mix_test
Fit to window
Zoom out
Zoom in

Annotations

11 errors and 1 warning
mix test (OTP 25.3.2.9 | Elixir 1.15.8): test/mix/tasks/phx.gen.auth_test.exs#L227
test generates with defaults (Prompt: --live) (Mix.Tasks.Phx.Gen.AuthTest)
mix test (OTP 25.3.2.9 | Elixir 1.15.8): test/mix/tasks/phx.gen.auth_test.exs#L87
test generates with defaults (Prompt: --no-live) (Mix.Tasks.Phx.Gen.AuthTest)
mix test (OTP 25.3.2.9 | Elixir 1.15.8)
Process completed with exit code 2.
mix test (OTP 27.2 | Elixir 1.17.3)
The job was canceled because "_1_15_8_25_3_2_9" failed.
mix test (OTP 27.2 | Elixir 1.17.3): test/mix/tasks/phx.gen.auth_test.exs#L87
test generates with defaults (Prompt: --no-live) (Mix.Tasks.Phx.Gen.AuthTest)
mix test (OTP 27.2 | Elixir 1.17.3): test/mix/tasks/phx.gen.auth_test.exs#L227
test generates with defaults (Prompt: --live) (Mix.Tasks.Phx.Gen.AuthTest)
mix test (OTP 27.2 | Elixir 1.17.3): test/phoenix/integration/endpoint_test.exs#L126
test adapters starts on configured port and serves requests and stops for prod (Phoenix.Integration.EndpointTest)
mix test (OTP 27.2 | Elixir 1.17.3)
Process completed with exit code 2.
integration-test-elixir (1.15.8, 25.3.2.9, alpine-3.20.3)
Process completed with exit code 2.
integration-test-elixir (1.17.3, 27.1.2, alpine-3.20.3)
The job was canceled because "_1_15_8_25_3_2_9_alpine-3" failed.
integration-test-elixir (1.17.3, 27.1.2, alpine-3.20.3)
The operation was canceled.
mix test (OTP 25.3.2.9 | Elixir 1.15.8)
The Ubuntu-20.04 brownout takes place from 2025-02-01. For more details, see https://github.com/actions/runner-images/issues/11101