Skip to content

Conversation

@ti-chi-bot
Copy link
Member

This is an automated cherry-pick of #21734

First-time contributors' checklist

What is changed, added or deleted? (Required)

Which TiDB version(s) do your changes apply to? (Required)

Tips for choosing the affected version(s):

By default, CHOOSE MASTER ONLY so your changes will be applied to the next TiDB major or minor releases. If your PR involves a product feature behavior change or a compatibility change, CHOOSE THE AFFECTED RELEASE BRANCH(ES) AND MASTER.

For details, see tips for choosing the affected versions.

  • master (the latest development version)
  • v9.0 (TiDB 9.0 versions)
  • v8.5 (TiDB 8.5 versions)
  • v8.1 (TiDB 8.1 versions)
  • v7.5 (TiDB 7.5 versions)
  • v7.1 (TiDB 7.1 versions)
  • v6.5 (TiDB 6.5 versions)
  • v6.1 (TiDB 6.1 versions)
  • v5.4 (TiDB 5.4 versions)

What is the related PR or file link(s)?

  • This PR is translated from:
  • Other reference link(s):

Do your changes match any of the following descriptions?

  • Delete files
  • Change aliases
  • Need modification after applied to another branch
  • Might cause conflicts after applied to another branch

@ti-chi-bot ti-chi-bot added lgtm size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR. v9.0-beta.3 This PR/issue applies to TiDB v9.0-beta.3. labels Nov 6, 2025
@gemini-code-assist
Copy link

Summary of Changes

Hello @ti-chi-bot, I'm Gemini Code Assist1! I'm currently reviewing this pull request and will post my feedback shortly. In the meantime, here's a summary to help you and other reviewers quickly get up to speed!

This pull request enhances the TiFlash server's shutdown mechanism by introducing a configurable grace period. This allows the server to gracefully complete any in-progress Massively Parallel Processing (MPP) tasks before fully shutting down, thereby improving system stability and data integrity during maintenance or restarts. The change ensures that TiDB instances are aware of a TiFlash server's graceful shutdown state and will not assign new tasks to it.

Highlights

  • New Configuration Parameter: Introduced a new configuration parameter, graceful_wait_shutdown_timeout, for TiFlash servers.
  • Graceful Shutdown Enhancement: This new parameter allows TiFlash to enter a graceful shutdown period, during which it continues to process existing MPP tasks but stops accepting new ones, ensuring ongoing analytical queries can complete.
  • Controlled Server Behavior: The configuration defines a maximum wait time (defaulting to 600 seconds) for tasks to finish before a forced shutdown, and TiDB is prevented from sending new MPP tasks to a server in this state.
Using Gemini Code Assist

The full guide for Gemini Code Assist can be found on our documentation page, here are some quick tips.

Invoking Gemini

You can request assistance from Gemini at any point by creating a comment using either /gemini <command> or @gemini-code-assist <command>. Below is a summary of the supported commands on the current page.

Feature Command Description
Code Review /gemini review Performs a code review for the current pull request in its current state.
Pull Request Summary /gemini summary Provides a summary of the current pull request in its current state.
Comment @gemini-code-assist Responds in comments when explicitly tagged, both in pull request comments and review comments.
Help /gemini help Displays a list of available commands.

Customization

To customize Gemini Code Assist for GitHub experience, repository maintainers can create a configuration file and/or provide a custom code review style guide (such as PEP-8 for Python) by creating and adding files to a .gemini/ folder in the base of the repository. Detailed instructions can be found here.

Limitations & Feedback

Gemini Code Assist may make mistakes. Please leave feedback on any instances where its feedback is incorrect or counter productive. You can react with 👍 and 👎 on @gemini-code-assist comments. If you're interested in giving your feedback about your experience with Gemini Code Assist for Github and other Google products, sign up here.

You can also get AI-powered code generation, chat, as well as code reviews directly in the IDE at no cost with the Gemini Code Assist IDE Extension.

Footnotes

  1. Review the Privacy Notices, Generative AI Prohibited Use Policy, Terms of Service, and learn how to configure Gemini Code Assist in GitHub here. Gemini can make mistakes, so double check it and use code with caution.

Copy link

@gemini-code-assist gemini-code-assist bot left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Code Review

This pull request adds documentation for the new TiFlash configuration parameter graceful_shutdown_wait_timeout. My review includes suggestions to improve clarity, conciseness, and adherence to the documentation style guide, such as using active voice and consistent formatting for parameter names.

@qiancai qiancai changed the title tiflash: add a config named graceful_shutdown_wait_timeout (#21734) Do not merge until v8.5.4: tiflash: add a config named graceful_shutdown_wait_timeout (#21734) Nov 6, 2025
@qiancai qiancai self-assigned this Nov 7, 2025
@qiancai qiancai changed the base branch from release-8.5 to feature/preview-v8.5.4 November 7, 2025 09:33
@qiancai qiancai changed the title Do not merge until v8.5.4: tiflash: add a config named graceful_shutdown_wait_timeout (#21734) v8.5.4: tiflash: add a config named graceful_shutdown_wait_timeout (#21734) Nov 10, 2025
@qiancai
Copy link
Collaborator

qiancai commented Nov 10, 2025

/approve

@ti-chi-bot
Copy link

ti-chi-bot bot commented Nov 10, 2025

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: qiancai

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@ti-chi-bot ti-chi-bot bot added the approved label Nov 10, 2025
@ti-chi-bot ti-chi-bot bot merged commit 7af6c87 into pingcap:feature/preview-v8.5.4 Nov 10, 2025
8 of 9 checks passed
@ti-chi-bot ti-chi-bot bot deleted the cherry-pick-21734-to-release-8.5 branch November 10, 2025 08:57
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved lgtm size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR. v9.0-beta.3 This PR/issue applies to TiDB v9.0-beta.3.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants