Skip to content
View alexc-hue's full-sized avatar

Block or report alexc-hue

Block user

Prevent this user from interacting with your repositories and sending you notifications. Learn more about blocking users.

You must be logged in to block users.

Content in all repositories owned by your account will be closed.
Maximum 250 characters. Please don’t include any personal information such as legal names or email addresses. Markdown is supported. This note will only be visible to you.
Report abuse

Contact GitHub support about this user’s behavior. Learn more about reporting abuse.

Report abuse
alexc-hue/README.md

Hi, I'm Alex

Project controls and technical PM professional (PMP®-certified) working across industrial and OT/IT delivery programmes. My core discipline is project controls, EVM, CPM scheduling, risk management, and change control, and I build the software that operationalizes it: methodologies that are usually run by hand in a spreadsheet, turned into repeatable, automated tools.

These methods reflect real project-controls practice: recovered a programme from four months behind schedule to three weeks late, an 85%+ recovery, using the same EVM/CPM discipline this toolkit automates.

Background: project controls and technical PM roles across engineering, industrial automation, and OT/IT delivery, including plant and process scripting (VBScript, Structured Text, FBD).

Project Controls Toolkit

Six practical tools that operationalize core project-controls disciplines as software, each reading from CSVs and producing charts plus a saved report. All six also share one fixed status color convention (good, warning, serious, critical) and chart style, the same single RAG standard a project controls function would enforce across a programme, not six different ad-hoc looks:

Integration

  • project-controls-reporting-engine: composes four of the tools below (schedule, EVM, risk, change) against one consistent programme into a single integrated status report, no new logic, just the four disciplines' findings shown side by side.

Schedule Integrity

  • schedule-health-analyzer: Critical Path Method, baseline vs current schedule, float erosion, and a Schedule Health Score.

Decision Support

  • recovery-scenario-planner: models and ranks recovery interventions (add resources, re-sequence, accept delay) against a programme's schedule/cost/risk status, the toolkit's decision layer: the other five tools report a status, this one recommends what to do about it.

Portfolio Reporting

  • project-controls-dashboard: EVM (SPI/CPI/EAC/ETC/VAC), milestone tracking, risk register, and change register, in one status report.

Risk & Change

  • risk-trend-tracker: risk register tracked over time: exposure trend, per-risk trajectory, and mitigation effectiveness.
  • change-control-register: cumulative budget/schedule creep from approved changes, decision cycle time, stale pending changes flagged.

A note on the code itself: project-controls-reporting-engine and recovery-scenario-planner don't import the other four tools' logic, they vendor it, copies of the EVM, CPM, and risk-scoring modules. That's a deliberate convention, not copy-paste sloppiness: every repo in this toolkit needs to stand alone and be cloneable on its own. Each copy records the source commit it came from, and CI checks both that nobody has edited the copy and that the source hasn't moved on without it.

Applied: data center practice models (synthetic data)

Two separate repos that apply the same methods to data center delivery. Everything in them is made up; they are practice models, not a record of real data center work.

  • commissioning-readiness-gate: per data hall, a ready / conditional / not-ready verdict with reasons for starting the next commissioning level (L1 to L5, strict sequencing), from the punch list, a design-load vs provisioned power and cooling check, and assets read from NetBox.
  • facility-status-digital-twin: CPM schedule status placed on a facility layout, built on the toolkit's CPM and EVM engines: one OpenUSD block per activity, colored by status. The facility is a grid of placeholder blocks, not a real data hall.

How the repos are kept honest

The sample output in each README is tested against what the code actually prints, so the numbers can't drift out of date. Where code review found a bug in the calculations or the report, there's a regression test for it, checked to fail without the fix. Every repo is versioned, with a changelog saying what changed in each release. Same thing I'd expect from a controls function: a baseline, a change record, and numbers you can trace back to where they came from.

Tools I work with

Project controls methods (EVM, CPM, schedule and risk analysis), operationalized in Python (pandas, matplotlib) and Excel. Also comfortable in MATLAB.

Beyond the toolkit

A few fixes outside this toolkit too, merged into other people's codebases: documentation and example corrections in NVIDIA's OpenUSD learning repository, one of which grew to cover every affected lesson after the maintainer asked for the rest; a Huawei server spec correction in NetBox's device-type library, checked against the manufacturer's datasheet; a crash in LibreNMS, the network monitoring platform, when an APC UPS reported a malformed date, fixed with a regression test; and a phpIPAM API endpoint that returned an empty 500 error, traced to its root cause. Same habit as the toolkit above: check the record against the source of truth, fix what's wrong.

Elsewhere

LinkedIn

Pinned Loading

  1. project-controls-reporting-engine project-controls-reporting-engine Public

    Composes the four project-controls toolkit tools (EVM, schedule health, change control, risk trend) against one consistent programme into a single integrated status report.

    Python 1

  2. commissioning-readiness-gate commissioning-readiness-gate Public

    Commissioning readiness gates, operationalized: per-hall ready/conditional/not-ready verdicts with reasons from L1-L5 records, punch list and a capacity check, keyed to NetBox. Synthetic sample data.

    Python 1

  3. schedule-health-analyzer schedule-health-analyzer Public

    The Critical Path Method, operationalized: baseline vs. current schedule, float erosion, and a composite schedule health score, computed automatically instead of eyeballed off a Gantt chart.

    Python 1

  4. recovery-scenario-planner recovery-scenario-planner Public

    Models and ranks recovery interventions (add resources, re-sequence, accept delay) against a programme's schedule/cost/risk status — the toolkit's missing decision layer, not another status report.

    Python 1

  5. project-controls-dashboard project-controls-dashboard Public

    Earned value management and project-controls reporting, operationalized: SPI/CPI, EAC/ETC/VAC, milestone tracking, and risk register analysis, computed automatically instead of rebuilt by hand.

    Python 1

  6. risk-trend-tracker risk-trend-tracker Public

    Risk management, operationalized: exposure trend, per-risk trajectory, and mitigation effectiveness, tracked across snapshots instead of judged from a single point in time.

    Python 1